Chair, ASCE Construction Research Council (2020 -2021)
Edward I. Weisiger Distinguished Scholar, Associate Professor
Construction Engineering and Management Program
Dept. of Civil, Construction, and Environmental Engineering
North Carolina State University
Resume
Financial support available for students who have obtained or will obtain Master Degree
and apply for Ph.D. Please send your transcript and resume to min_liu@ncsu.edu
Join us celebrating Women Leaders in Construction!
Congratulations to Dr. Liu's group on winning the 2021 ASCE Thomas Fitch Rowland Award!
Dr. Min Liu, along with co-authors and her Ph.D. students, Dr.s Ashtad Javanmardi and Alireza Abbasian-Hosseini,
and Dr. Simon Hsiang, were selected to receive the 2021 ASCE Thomas Fitch Rowland Award for their paper titled
"Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach".
ASCE Thomas Fitch Rowland Award is given to papers which are valuable contributions to construction engineering
and management and published in ASCE journals in the previous year.
Congratulations to Chuanni He on receiving the 2021 CII (Construction Industry Institute)
- Outstanding Student Award!
This award is for recognizing a student's important contribution to a CII initiative that has the potential to significantly
improve the construction industry. Chuanni is a Ph.D. candidate who joined Dr. Liu's group in Fall 2019.
Congratulations to Gongfan Chen on receiving the Best Student Paper Award at the 2021
Canadian Society of Civil Engineers Annual Conference!
The paper title is "Situation Awareness Based Smart Contract for the Modular Construction". Gongfan is a Ph.D.
candidate who joined Dr. Liu's group in Fall 2019.
Research Interests 1. Construction labor productivity performance measurement and improvement 2. Lean Construction techniques for enhancing project performance 3. Construction project performance improvement (Change order's impact on project performance; Benefit/cost Tradeoff Analysis of BIM related tool application; Safety; Cost/Schedule; Quality; Risk) 4. International project management Education
Ph.D. University of California, Berkeley MSCE Xi'an University of Architecture and Engineering
MSc National University of Singapore BSCE QingDao University of Technology
|
|
People Current Graduate Students: PhD students: MSc student: Chuanni He (August 2019 - present) ZhiGao Wang (August 2019 - present) Gongfan Chen (August 2019 - present) KeWang Jiang (August 2020 - present) Min Zhang (August 2020 - present) Fan Ding (August 2021 - present) Former Graduate Students: PhD students: Ashtad Javanmardi, 2019 July Thesis Title: Strategies and Predictive Models for Reducing Workflow Variability in Construction Production Systems Current Position: Engineering Manager, FDH Infrastructure Services Dr. Brad McCoy, 2019 May Thesis Title: Design and Implementation of a New Retrofit for Prestressed Concrete Bridge Elements Using Mechanically-Fastened Fiber-Reinforced Polymer Current Position: Academy Professor, West Point, Dept. of Civil and Mechanical Engineering Dr. Alizera Abbasian Hosseini, 2015 October Thesis Title: Social and Engineering Aspects of Construction Site Management using Simulation and Social Network Analysis Current Position: Project Manager, Flatrion Construction Dr. Marion M. Russell, 2013 June Thesis Title: Allocation of Time Buffer to Construction Project Task Durations Current Position: Major, Academy Professor, U.S. Air Force Academy, Dept of Civil Engineering Dr. Brad W. Wambeke, 2011 May Thesis Title: Identifying, Prioritizing, and Reducing Variation of Construction Related Tasks Current Position: Colonel, Director CE Division, Academy Professor/Associate Professor, West Point, Dept. of Civil and Mechanical Engineering Dr. Donna Hollar, 2011 July, co-advised with Prof. William Rasdorf and Prof. Joe Hummer Thesis Title: Predicting Preliminary Engineering Costs for Highway Projects Current Position: Associate Professor, East Carolina University, Dept. of Construction Management MSc students: NingNing Liu, June 2021 Thesis Title: Improving Construction Planning Reliability - An Information Theory Based Exploration Minerva Bonilla, May 2020 Thesis Title: Estimating Seasonal Population's Impact for Powell Bill Funding Allocation Naishan Xiang, May 2015 Thesis Title: Predicting, Benchmarking and Warning the Impact of Change for Construction Projects Current Position: Business Intelligence Engineer, Amazon Joshua L. Vaughan, 2012 December Thesis Title: Effects of an Innovative Technology on Construction Management Time Current Position: Assessment Engineering Supervisor, North Carolina Department of Transportation Kiarash Hajifathalian, 2011 May Thesis Title: Effects of Working Strategy and Duration Variance on Productivity and Work in Process A Simulation-Based Investigation Current Position: Regional Project Manager, Baker Concrete Construction Chao Wang, 2010 July Thesis Title: Causes and Penalties of Variation - Case Study of a Concrete Slab Prefabrication Shop Current Position: Project Manager, Bureau Veritas Jaime m. Perez, 2009 May Thesis Title: Implementing Target Costing Principles in Green Building Current Position: Project Manager, Odebrecht Major Collaborators Prof. Gregory Howell, Lean Construction Institute Prof. and Dept. Head, Simon Hsiang, Dept. of Industrial Engineering, Univ. of North Carolina, Charlotte, co-advising students since 2008 Prof. Glenn Ballard, UC Berkeley, Dept. of Civil and Environmental Engineering Book Publications Kwak,Y. Liu, M., Patanakul, P., and Zwikael, O. (2014) “Challenges and Best Practices of Managing Government Projects”, Project Management Institute Inc., Newtown Square, PA. ISBN 978-1-62825-065-7. Journal Paper Publications Google Scholar Citations *Graduate student at the North Carolina State University, **Corresponding author 1. Schiavone,V., Scala, N., Olivieri, H., Seppänen,O., Alves, T., Liu, M., Granja, A. (2022). “Comparative Analysis of the Implementation of Critical Path Method, Last Planner System, and Location-Based Techniques in Brazil, Finland, and the United States” Accepted by Engineering Management Journal in March 2022. 2. He, C.*, Liu, M.**, Scala, N., Liu, M., Alves, T., and Hsiang, S. (2022). “Finding Lean Explanation for Collaborative Scheduling.” Accepted by Journal of Management and Economics in February 2022. 3. Scala, N., Liu, M., Alves, T., and Hawkins, D., Schiavone, V. (2022). “The Gold Standard: A Collaborative Scheduling Maturity Model.” Engineering, Construction, and Architectural Management, published online in February 2022. https://www.emerald.com/insight/content/doi/10.1108/ECAM-07-2021-0609/full/html Find the paper here. 4. He, C.*, Liu, M.**, Wang, Z., Zhang, Y., Hsiang, S., Chen, G., Chen, J. (2022). “Space-Time-Manpower Visualization and Conditional Capacity Planning in Uncertainty.” Accepted by ASCE Journal of Construction Engineering and Management in January 2022. 5. Liu, Y., Javanmardi, A.*, Zhang, Y., Liu, M.** , Yang, S., Yu, X., Hsiang, S., Jiang, Z., and (2021). “Comparing Factors Affecting Task Starting Time and Duration Variation – China vs. the U.S. Construction Projects.” ASCE Journal of Construction Engineering and Management, 147(3), 04020176. https://ascelibrary-org.prox.lib.ncsu.edu/doi/10.1061/%28ASCE%29CO.1943-7862.0001985 6. McCoy, B. C.*, Bourara, Z., Lucier, G.W., Seracino, R., and Liu, M. (2021). “Prestressed MF-FRP: An Experimental Study of a Rapid Retrofit Concept for Deteriorated Prestressed C-Channel Beams.” ASCE Journal of Performance of Constructed Facilities, 35(1), 1-10. https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CF.1943-5509.0001536 7. Zhang, Y., Javanmardi, A.*, Liu, Y., Yang, S., Yu, X., Hsiang, S., Jiang, Z., and Liu, M.** (2020). “How Does Experience of Delay Shape Managers’ Making-do Decision: A Random Forest Approach.” ASCE Journal of Management in Engineering, 36(4), 04020030. Open Access link: https://ascelibrary.org/doi/full/10.1061/%28ASCE%29ME.1943-5479.0000776 8. Javanmardi, A. *, Hosseini, A. *, Liu, M.,** Hsiang, S. (2020). “Improving Effectiveness of Constraints Removal in Construction Planning Meetings: An Information-theory based Approach.” ASCE Journal of Construction Engineering and Management, 146(4), 04020015. https://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001790 9. Alves, T., Liu, M., Scala, N., Javanmardi, A.* (2020). “Schedules and Schedulers: A Study in the U.S. Construction Industry.” Engineering Management Journal, 32(3), 166-185. https://www.tandfonline.com/doi/abs/10.1080/10429247.2020.1738878?journalCode=uemj20 10. Olivieri, H., Seppänen, O., Alves, T., Scala, N., Liu, M., and Granja, A. (2019) “A survey comparing Critical Path Method, Last Planner System, and Location-Based techniques.” ASCE Journal of Construction Engineering and Management, 145(12), 04019077. https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0001644 Find the paper here. 11. Hosseini, A.*, Liu, M.**, Howell, G. (2018). “Investigating the Cost Benefit Tradeoff of Additional Planning Using Parade Game Simulation.” ASCE Journal of Management in Engineering, 34(2), 04017066. https://ascelibrary.org/doi/full/10.1061/%28ASCE%29ME.1943-5479.0000580?src=recsys 12. Javanmardi, A.*, Hosseini, A., Liu, M.**, Hsiang, S. (2018). “Benefit of Cooperation among Subcontractors in Performing High-Reliability Planning.” ASCE Journal of Management in Engineering, 34(2), 04017062. https://ascelibrary-org.prox.lib.ncsu.edu/doi/10.1061/%28ASCE%29ME.1943-5479.0000578 13. Hosseini, A.*,Liu, M.**, Hsiang, S.(2017). "Social Network Analysis for Construction Crews." Published online by International Journal of Construction Management in November 2017. http://www.sciencedirect.com/science/article/pii/S0926580517300195 14. Hosseini, A.*, Liu, M.**, Hsiang, S. (2017). "Social Network Conformity and Construction Work Plan Reliability." Automation in Construction, 78(1), 1-12. http://www.tandfonline.com/doi/abs/10.1080/15623599.2017.1389642 15. Russell, M. *, Hsiang, M., Liu, M.**, and Leming, M. (2016). "Causes of Time Buffer and Duration Variation in Construction Project Tasks." Construction Management and Economics, 33(10), 783-798. http://www.tandfonline.com/doi/abs/10.1080/01446193.2015.1137335?journalCode=rcme20 16. Hajifathalian, K.*, Howell, G., Wambeke, B.*, Hsiang, S., and Liu, M.** (2016). ““Oops” Simulation: Cost–Benefits Trade-Off Analysis of Reliable Planning for Construction Activities." ASCE Journal of Construction Engineering and Management, 142(8), 04016030. http://ascelibrary.org/doi/full/10.1061/%28ASCE%29CO.1943-7862.0001135 17. Kwak, Y., Patanakul, P., Zwikael, O., and Liu, M. (2016). "What Impacts the Performance of Large Scale Government Projects?" International Journal of Project Management, 34(3), 452-466. http://www.sciencedirect.com/science/article/pii/S0263786315001921 18. Hosseini, A.*, Leming, M. and Liu, M.** (2015). "Effects of Idle Time Restrictions on Excess Pollution from Construction Equipment." ASCE Journal of Management in Engineering, 32(2), 04015046. http://ascelibrary.org/doi/abs/10.1061/(ASCE)ME.1943-5479.0000408 19.Hosseini, A.*, Liu, M.**, and Leming, M. (2015). "Comparison of Least-Cost and Least-Pollution Equipment Fleet Configurations Using Computer Simulation." ASCE Journal of Management in Engineering, 31(6), 04015003.http://ascelibrary.org/doi/abs/10.1061/(ASCE)ME.1943-5479.0000360 20. Russell, M. *, Liu, M.**, Howell, G., and Hsiang, S. and Leming, M. (2015). "Case Studies into the Allocation and Reduction of Time Buffer Through Uses of Last Planner System." ASCE Journal of Construction Engineering and Management, 141(2), 04014068. http://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000900 21. Hosseini, A.*, Leming, M., Liu, M.**, Hsiang, S. (2014). "From Social Network to Data Envelopment Analysis: Identifying Benchmarks at the Site Management Level." ASCE Journal of Construction Engineering and Management, 140(8), 04014028.http://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000875 22. Russell, M. *, Hsiang, M., Liu, M.**, and Wambeke, B.Wambeke, (2014). "Causes of Time Buffer and Duration Variation in Construction Project Tasks." ASCE Journal of Management in Engineering, 140(6), 04014016. http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000819 23. Wambeke, B.*, Liu, M.**, and Hsiang, S. (2013). "Task Variation and the Social Network of Construction Trades." ASCE Journal of Management in Engineering, 05014008, 30(4).http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000219 24. Russell, M. *, Howell, G., Hsiang, M., and Liu, M.** (2013). "The Application of Time Buffers to Construction Project Task Durations." ASCE Journal of Construction Engineering and Management,139(10), 04013008.http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000735 25. Vaughan, J.*, Leming, M., Liu, M.**, and Jaselskis, E. (2013). "Cost-Benefit Analysis of Construction Information Management System Implementation -A Case Study." ASCE Journal of Construction Engineering and Management,139(4), 445-455.http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000611 26. Liu, M., Rasdorf, W., Hummer, J., Hollar, D.*, and Parikh, S.* (2013). "Preliminary Engineering Cost-Estimation Strategy Assessment for Roadway Projects." ASCE Journal of Management in Engineering, 29(2), 150-157. http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000137 27. Hollar, D.*, Rasdorf, W., Liu, M., Hummer, J.E., Arocho, I., and Hsiang, S. (2013). "A Preliminary Engineering Cost Estimation Model for Bridge Projects." ASCE Journal of Construction Engineering and Management, 139(9), 1259–1267. http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000668 28. Wambeke, B.*, Liu, M.**, and Hsiang, S.(2012). "Using Pajek and Centrality Analysis to Identify a Social Network of Construction Trades."ASCE Journal of Construction Engineering and Management, 138(10), 1192-1201.http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000524 29. Hajifathalian, K.*, Wambeke, B.*, Liu, M.**, and Hsiang, S. (2012). "Effects of Working Strategy and Duration Variance on Productivity and Work in Progress." ASCE Journal of Construction Engineering and Management, 138(9), 1035-1043.http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000517 30. Wang, C.*,Liu, M.**, Hsiang, S., and Leming, M. (2012). "Causes and Penalties of Variation - A Case Study of a Precast Concrete Slab Production Facility." ASCE Journal of Construction Engineering and Management, 138(6), 775-785. http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000475 31. Wambeke, B.*, Liu, M.**, and Hsiang, S.(2012). "Using Last Planner ™ and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks." ASCE Journal of Construction Engineering and Management, 138(4), 491-498. http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000444 32. Wang, Y. and Liu, M. (2012). "Prices of Highway Resurfacing Projects in Economic Downturn: Lessons Learned and Strategies Forward." ASCE Journal of Management in Engineering, 28(4), 391-397. http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000094 33. Wambeke, B.*, Hsiang, S., and Liu, M.** (2011). "Causes of Variation in Construction Project Task Starting Times and Duration." ASCE Journal of Management in Engineering,, 137(9), 663-677.http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000342 34. Chui, D. L. N., Liu, M., and Ling, Y. Y. (2011). "Adopting HR Practices to Improve Construction Safety – A Comparative Study on Construction Safety in Singapore and United States." International Journal of Project Management, 29(8), 1018-1032. http://www.sciencedirect.com/science/article/pii/S0263786310001481 35. Ibbs, W. and Liu, M**. (2011). "An Improved Methodology for Selecting Similar Working Days for Measured Mile Analysis." International Journal of Project Management, 29(6), 773-780. http://www.sciencedirect.com/science/article/pii/S0263786310001109 36. Liu, M.**, Ballard, G., and Ibbs, W. (2010). "Work Flow Variation and Its Relation to Labor, -- A Case Study." ASCE Journal of Management in Engineering, 27(4), 236-242. http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000056 37. Ling, Y. Y., Liu, M.**, and Woo, Y. C. (2009) "Construction Fatalities in Singapore." International Journal of Project Management, 27(7), 717-726. http://www.sciencedirect.com/science/article/pii/S0263786308001610 38. Ibbs, W. and Liu, M. (2005). "An Improved Measured Mile Analysis Technique." ASCE Journal of Construction Engineering and Management, 131(12), 1249-1256. http://ascelibrary.org/doi/abs/10.1061/%28ASCE%290733-9364%282005%29131%3A12%281249%29 39. Liu, M.** and Ling, Y. Y. (2005). "Modeling a Contractor’s Markup Estimation." ASCE Journal of Construction Engineering and Management, 131(4), 391-399. http://ascelibrary.org/doi/abs/10.1061/%28ASCE%290733-9364%282005%29131%3A4%28391%29 40. Ling,Y. Y. and Liu, M. (2005). "Factors Considered by Successful and Profitable Contractors in Mark-up Size Decision in Singapore." Building and Environment, 40(11), 1557-1565. http://www.sciencedirect.com/science/article/pii/S0360132304003683 41. Ibbs, W. and Liu, M. (2005). "System Dynamic Modeling of Delay and Disruption Claims." AACE Cost Engineering, 47(6), 12-15. http://eds.a.ebscohost.com/ehost/detail?vid=3&sid=fed5f87a-085f-4057-acfa-aca96555aff2%40sessionmgr4001&hid=4213&bdata=JnNpdGU9Z Whvc3QtbGl2ZSZzY29wZT1zaXRl#db=bth&AN=17204661 42. Ling, Y. Y. and Liu, M. (2004). "Using Neural Network to Predict Performance of Design-Build Projects in Singapore." Building and Environment, 39(10), 1263- 1274. http://www.sciencedirect.com/science/article/pii/S0360132304000782 43. Liu, M. and Ling, Y. Y (2003). "Using Fuzzy Neural Network Approach to Estimate Contractor’s Markup." Building and Environment, 38(11), 1303-1308. http://www.sciencedirect.com/science/article/pii/S0360132303001355 44. Zhao, P., Liu, M., and Xie, X. H. (1998). "Computer Simulation for Construction Project Investment Decision." Journal of Xi’an University of Architecture and Technology, 30(3), 290-293 (in Chinese). Updated in March 2022 |
|